Permanent Base Station Structure (For the duration of the Job)
I’m looking for suggestions as to base station construction that I can
build and just have the site foreman’s attach a base daily and go.
Currently they are putting a 6′ 4×4 in concrete, with 4 support legs
made for 2×4’s with a cap attached to the top of the 4×4 with a screw on
adapter for the base.
It does work fine. I’m just looking for other ideas.
TIA,
Bo
Log in to reply.