Posted by leegreen on January 20, 2021 at 8:55 pmLearning to use the new Faro Focus S150+
Measuring 400 Embed Plates in stair towers before they completely shrink-wrap the building in plastic.
rover83 replied 3 years, 3 months ago 3 Members · 3 Replies- 3 Replies
So how come the 2nd from left on the top level is missing. All other levels have 7 red rectangles.
That’s exactly why they need asbuilts. The contractor apparently had a tough time reading the plans. They missed all the embeds on the first floor. Some are off by 10″ in elevation.
- Posted by: @leegreen
That’s exactly why they need asbuilts. The contractor apparently had a tough time reading the plans. They missed all the embeds on the first floor. Some are off by 10″ in elevation.
Oof. I would guess that’s gonna hurt a bit. I have nightmares about steel stakeouts gone wrong.
On the flip side, I am often surprised at the discrepancies found in structural plansets.
Just last week I spent half a day re-calculating a bridge span and checking all our cut sheets because the contractor was insisting that our grades were wrong. Turned out a single elevation tag in the planset was not snapped to the deck profile in the actual CAD drawings.
“…people will come to love their oppression, to adore the technologies that undo their capacities to think.” -Neil Postman